diff options
| author | Fabian Mastenbroek <mail.fabianm@gmail.com> | 2021-09-26 13:11:10 +0200 |
|---|---|---|
| committer | Fabian Mastenbroek <mail.fabianm@gmail.com> | 2021-10-03 17:17:37 +0200 |
| commit | d575bed5418be222e1d3ad39af862e2390596d61 (patch) | |
| tree | e00656f774a62543a032284f5ef00da479b293d6 /buildSrc | |
| parent | a4a611c45dfd5f9e379434f1dc459128cb437338 (diff) | |
refactor(simulator): Combine work and deadline to duration
This change removes the work and deadline properties from the
SimResourceCommand.Consume class and introduces a new property duration.
This property is now used in conjunction with the limit to compute the amount
of work processed by a resource provider.
Previously, we used both work and deadline to compute the duration and
the amount of remaining work at the end of a consumption. However, with
this change, we ensure that a resource consumption always runs at the
same speed once establishing, drastically simplifying the computation
for the amount of work processed during the consumption.
Diffstat (limited to 'buildSrc')
0 files changed, 0 insertions, 0 deletions
